Wastewater Treatment Plant - EPC Contractor, Qatar

Experience:

Providing the EPC Contractor with specialist construction and engineering legal advice in relation to the non-negotiable “contract documents” for a Wastewater Treatment Plant in Ras Laffan in Doha (USD 250 m). Acting as the Contractor’s OPC throughout the project’s lifecycle. Specifically, protecting the Client’s position and resolving its potential disputes amicably with its Subcontractors and the Employer throughout the project’s lifecycle.

  • Client: EPC Contractor
  • Value: USD 250 m
  • Location: Qatar
  • Sectors: Water / Wastewater
  • Services: Outsourced Project Counsel