Experience:
Representing the EPC Contractor in relation to a dispute (USD 50 m) with a Subcontractor regarding the design and construction of a large shopping mall in Dubai. Specifically, the dispute related to a number of issues emanating from cracks in the concrete floor slabs including design, post tensioning, variations, price escalation of materials and delay.